Service: | 24-Hour Online Service |
---|---|
MOQ: | 1 Ton |
Delivery Time: | 5-7 Days |
Payment Term: | EXW/Fob/CIF |
Payment Method: | Tt/LC |
Sample: | Free of Charge |
Samples: |
---|
Suppliers with verified business licenses
Product name | Reinforced steel bar steel rebar/Ribbed steel bars |
Standard | ASTM, AISI, EN, DIN, JIS, GB |
Grate | HRB400/HRB500/KSD3504 SD400/KSD3504 SD500/ASTM A615, GR40/ASTM GR60/BS4449 B500B/BS4449 B460 Etc. |
Material | HRB335, HRB400, HRB500, JISG3112-2004 SD390; BS4449-1997 Gr.460B; BS4449:2005 B500B/B500C |
Specifications | Diameter(6-50mm) 6mm,8mm,10mm,12mm,16mm,20mm,22mm,25mm,28mm,32mm, 40mm,50mm Or OEM Length:6m-12m as your required |
Application | Rebar is widely used in building, bridge, road and other civil engineering construction. |
Standard |
GB:HRB400 HRB400E HRB500 |
USA:ASTM A615 GR40,GR60 | |
UK: BS4449 GR460 | |
Inspection Methods |
Tensile testing |
(1) Tensile test method: GB/T228.1-2010, JISZ2201, JI SZ2241, ASTMA370, 1497, BS18, etc; | |
(2) Bending test method: often use standard test methods have GB/T232-88, YB/T5126-2003, JISZ2248, ASTME290, |
Item | Detail |
Packing | In bundle with steel strip or packed in wooden pallets or as customers requirement |
Trade terms | FOB/CIF |
Port of shipment | Tianjin/Qingdao/Shanghai |
Shipment | By sea or train |
Delivery time | 1. Normal size: 3-7days send from warehouse directly. 2. Special size: 7-10days custom made for you. |
We have hundreds of satisfied customers from all over the world. Please review some of our customer testimonials below. We always want to improve - please do submit your feedback, please email us, or give us a call. Thank you.
1.What are your company's main products?
Metal materials, including stainless steel, aluminum, section steel, color coated galvanized, etc. We support customization.
2. How do you control quality?
We have ISO and other certificates to support customer factory inspection and third-party inspection of goods.
3.What are the advantages of your company?
We have advanced production lines and 24-hour online services.
supporting pre order factory inspection and post order inspection services.
4. How to get samples?
We provide free samples.
5. How long is the delivery time and how much is the shipping fee?
The delivery time is determined by the quantity of goods, and most of the time is 3-5 days.
The shipping cost depends on your port location
Suppliers with verified business licenses